← Back to Book Detail

Module 4A – Design (21/20) -- Introduction to Mechanical Engineering D...

Browse
105%

Module 4A – Design

Module 4A – Design Design Phase Begin detailed design work for selected Final Design This includes: - math modeling - risk assessment & mitigation (DFMEA -design failure mode & effects analysis) - bill of materials (BOM), - purchase order, - part cost determination - profit/loss (P/L) statement - mfg process instructions (MPIs) - both a sub-assembly - final product design (Solidworks) approval process resulting in a final engineering design package submittal - final prototype design is manufactured/built/assembled - may also result in ECNs (engineering change notices) as a result of the manufacturing/build/assembly process prior to testing Definition of a prototype - An original module on which something is patterned; archetype. - An individual that exhibits the essential features of a later type. - A standard or typical example. - A first full-scale and usually functional form of a new type or design of a construction. Your team’s prototyping goal Build/manufacture/assemble a team-designed “functional” device, and test essential performance measures of the product design. Why build a prototype? - Conceptualization: Demonstrate feasibility/practicality. - Verification and Testing: Verify performance modeling. Prove/disprove assumptions made. - Development – Refine the Design: Identify design deficiencies/improvement. Suggest a mass manufacturing process. | Time | Cost | Materials | Tools/Process | Personnel | Tote Sizes | | | | | | |
← Previous Chapter Next Chapter →