Suppose I want to manually run from my IDE (Intellij IDEA, or eclipse) 4000 JUnit tests; the first 1000 tests run pretty smoothly (say they take 3 minutes all 1000) but the test 1001 takes alone over 30 minutes. Is there a way I can skip the test 1001 (while it's still running) and to let the test 1002 (and the others) keep going. I do not want to @Ignore the test 1001 and rerun the suite because I already have the answer for tests 1-1000; also I do not want to select tests 1001-4000 because it takes too much time.
I would some kind of button - Skip Current Test - which can be pressed when the test is running.
In case such feature does not exist, an enhancement for it needs to be done by the IDE developers or by JUnit developers?