KnowledgeHub
Questions
Tags
Users
Search
Alex Rivera
|
Logout
Edit Question
Title
Body
I have two devices HTC with android 2.3.5 and Samsung with 2.3.6 now the problem i am facing is i need the date's week of month. So i've written this code and installed on both the phones. and set the system date as 27th Jan 2013 Calendar calendar = Calendar.getInstance(); int weekOfMonth = calendar.get(Calendar.WEEK_OF_MONTH); Log.i(TAG,"weekOfMonth = "+weekOfMonth); now on HTC the output is weekOfMonth = 5 while on samsung running the same code produces weekOfMonth = 4 this really is screwing my logic n calculations ahead. am i doing something wrong ?
Tags (comma-separated)
Save Edits
Cancel