I would like to clear one concept. In c#, when we build(or re-build) a solution, We sometimes get Build: 1 succeeded

and sometimes,

Build: 1 succeeded or up-to-date

Ok, I know that something in our code would be not as per logic when we get the latter ans.

But, what does it mean CONCEPTUALLY?

Edit
Report