"Evidence-based scheduling" in FogBugz is interesting, but how do I use it w/ an Agile methodology?
I asked the FogBugz guys the same thing because in XP for example you'd provide the estimate in IET (ideal engineering time). Their answer was to be consistent in the way you provide the estimate.