KnowledgeHub
Questions
Tags
Users
Search
Alex Rivera
|
Logout
Edit Question
Title
Body
After checking in a change-set into source control in VS2010 TFS, how do I make corrections to the work items associated with the check-in. For example if I realize there was another work item that should be linked to the changeset or if it was a bug fix and it was linked to the wrong bug work item?
Tags (comma-separated)
Save Edits
Cancel