How to Stain Concrete Floors

Beginner 15 min 18 steps 44640 views Rating: 4.9/5 Published: 2026-05-01

Repair damaged spots using a concrete patching compound.. Polish the floor. Vacuum the floor to remove dust and debris.

Start Playback
E
Author

Steps

1

Repair damaged spots using a concrete patching compound.

Step 1

Repair damaged spots using a concrete patching compound.

2

Polish the floor

Step 2

Polish the floor

3

Vacuum the floor to remove dust and debris.

Step 3

Vacuum the floor to remove dust and debris.

4

Clean the floor with soapy water to eliminate any remaining dirt.

Step 4

Clean the floor with soapy water to eliminate any remaining dirt.

5

Consider etching the floor to help the stain adhere.

Step 5

Consider etching the floor to help the stain adhere.

6

Tape off areas you don't want to come into contact with the stain.

Step 6

Tape off areas you don't want to come into contact with the stain.

7

Make sure your work area is as well-ventilated as possible.

Step 7

Make sure your work area is as well-ventilated as possible.

8

Mix the stain with the recommended amount of water.

Step 8

Mix the stain with the recommended amount of water.

9

Start applying the stain at the back of the room.

Step 9

Start applying the stain at the back of the room.

10

Spray the stain onto the concrete surface using overlapping strokes.

Step 10

Spray the stain onto the concrete surface using overlapping strokes.

11

Use a broom to spread the wet stain.

Step 11

Use a broom to spread the wet stain.

12

Allow the stain to dry for 3-4 hours.

Step 12

Allow the stain to dry for 3-4 hours.

13

Wet a small section of the stain to test the color if desired.

Step 13

Wet a small section of the stain to test the color if desired.

14

Apply additional coats as needed.

Step 14

Apply additional coats as needed.

15

Let the stain dry for 12-24 hours.

Step 15

Let the stain dry for 12-24 hours.

16

Scrub the floor with a mild all-purpose cleaner to ensure that it's clean.

Step 16

Scrub the floor with a mild all-purpose cleaner to ensure that it's clean.

17

Roll the sealant onto the stained floor using a low-nap roller.

Step 17

Roll the sealant onto the stained floor using a low-nap roller.

18

Allow the sealant to cure for 1-2 days before using the floor again.

Step 18

Allow the sealant to cure for 1-2 days before using the floor again.

View as Slideshow